X
PROFILE

OUR SERVICE

Before installation and after preparation work

Before installation:

1.Hydraulic universal testing machine:

1) First check whether the packaging is intact after receipt of the equipment, Equipment required to prepare a three-phase (three FireWire one neutral wire) and hydraulic oil (No. 46 or No. 68, hydraulic oils).

2) Ask the machine’s foundation installation diagram to the company.

3) Unpack the device, the device will be moved to the foundation fixed.

4) According to the case, check the various parts are complete.

5) Ready for the experiment used a sample, with trained personnel.

2.Electronic universal testing machine:

1) First check whether the packaging is intact after receipt of the equipment, then to ready electricity. (10 tons of equipment including 10 tons of conventional electrical power is ready electric 220V, Panasonic motor is ready electric 380V).

2) Unpacking, according to the case, check various aids are complete.

3) Move the device to ideal position (Caution;when moving the device must be to a vertical, non-bump individual components).

4) Ready to do the experiment with a sample and the trainees.